Path to this page:
Subject: CVS commit: wip/taskcoach
From: Ryo ONODERA
Date: 2011-11-16 14:52:13
Message id: E1RQfug-0005n4-JD@sfs-ml-1.v29.ch3.sourceforge.com
Log Message:
Update to 1.2.31
Changelog:
Release 1.2.31 - November 13, 2011
This is a mixed bugfix and feature release.
Bugs fixed:
- Immediately update the number of tasks completed in the status bar of the
task viewer when the user marks a task completed. (SF#3185805)
- When adding new tasks, Task Coach would first show them briefly as inactive
before showing them as active. (SF#3085362)
- Only "preset" dates on new tasks.
- When changing a date/time inline, hitting enter in the date part of the
control would close the inline control, but not change the date.
(SF#3428503)
- The inline edit controls for dates/times didn't use the preferences for
start and end of working day. (SF#3431160)
- Using drag and drop to change dates in the calendar view would produce
erroneous results in some configurations. (SF#3428525)
- In some configurations, some hours would not be drawn in the calendar view
in vertical mode. (SF#3428524)
Features added:
- When exporting to CSV, dates and times can optionally be put in separate
columns.
- When exporting to CSV and HTML, the columns to be exported can be changed in
the export dialog.
- Simple task statistics viewer added that shows a pie chart of the
distribution of task states.
Files: